Building codes in many states now require elevators and personnel elevators on construction sites. In California, Nevada, and Washington, multi-story projects with a height of more than 60 feet are required. The same rule applies in other states, New York for example, to structures that are more than 75 feet tall. 


Lifts for construction workers must be installed at the same height as the stairwells required by Article 1629. The height of the building substance is determined by measuring the lowest floor from the ground floor to the top level, including, but not limited to, the first floor, the second floor and the third floor of the building, with the exception of the third, fourth, fifth, sixth, seventh, eighth, ninth, tenth and eleventh floors. Its depth determines the lower levels, which are measured at ground level (except on the second, third, and eighth floors and on the fourth floor) and reaches a maximum height of 60 feet. 


For the purposes of this section, the ground floor is defined as the height of the building substance from the first floor to the top floor and the depth of all the lower levels. 


Before redesigning, it is advisable to use a platform lift in cases where a ramp or elevator is not technically feasible or in places that allow a new building. Platform elevators must comply with the requirements of the Federal Building Code and the U.S. Department of Housing and Urban Development. 


ASME A18 - 1 includes lifts intended for the transport of people with disabilities. The law requires that the design, construction, operation, maintenance, and operation of all moving sidewalks and automated passenger transportation comply with applicable laws and regulations. The law states that a person may not construct, construct, maintain, inspect, remove, replace, or remove any means of transport contained in a building or structure unless he has the appropriate license. 


The Elevator Safety Department has noticed that we have not made clear the various options available to transport companies to meet the new requirements. We would like to remind everyone that access to lifts, pits, and cable cars is restricted to authorized persons. 


Recent changes to the law include accelerated compliance periods and restricted opening of lifts, pits, and cable cars. The new requirements, as set out in the New Zealand Construction Safety Act of 2010 (the New Zealand Elevator Act), will become effective as federal law. 


The LULA lift is a passenger lift approved for use in facilities where no barrier-free access to the mezzanine floor is required. Elevators that meet the SS407 requirements for accessibility cannot be replaced by a non-barrier-free lift, such as an elevator on the second floor of a building. 


General public passenger elevators largely comply with Sections 3008 - 1 and 300 8 - 10, except when no other elevator is used to self-evacuate the occupants. For example, if an elevator is to be used to self-evacuate residents in the event of a fire, the elevator must comply with these sections in some way, but not in all cases. 


If additional escape routes are required, it may be necessary to add an additional exit or staircase to provide the building with a passenger lift in accordance with section 3008-1. 


The building has approved fire safety and evacuation plan as described in Section 3008-1 of the New York Fire Code. Fire evacuation plans must include an evacuation elevator for residents and an evacuation elevator for residents. 


The building is equipped with an approved and electrically monitored automatic sprinkler system unless otherwise permitted as prohibited in section 3008-2-1.


Under the Pennsylvania Uniform Construction Code, the Department of Labor and Industry has the authority to approve elevator and other hoist locations in Pennsylvania as specified in Section 405-2 of the UCC Regulations. In addition to these provisions, any structural modification of a lifting device must comply with the technical standards outlined below. Elevators or other elevator equipment must be installed in a manner that meets the requirements of U CC regulations and all applicable state and federal laws. 


The requirements in paragraph c) 16 do not apply to cantilevered personnel hoists. Please note that all other requirements specified in this standard have been specifically adapted to exclude the use of a hoist in the construction of an elevator or other lifting device (see below). 


OSHA requires construction workers to comply with ANSI standard A10 - 4 (2004) for the construction of elevators and other hoists in construction projects. As stated in Question 1, none of OSHA's building standards provides for the use of a hoist in the design, construction, or operation of an elevator or other elevator device.