Installation method of Construction Hoist Mast Section Connecting Bolts

- May 17, 2019-

The installation method of Mast Section Connecting Bolts

[KANGBO Machinery Group - Warm Tips] 

Our proposal for connecting bolts installation of constuction hoist mast sections is 'Screw Mounted From Bottom To Top, Don't Forget, Check Regularly, Keep In Mind For Safe Operation.' 

The installation method of Mast Section Connecting Bolts should be from bottom to top, so, nuts are on top and bolts are at the bottom. 

Once the nut is loose, the bolt will fall off, which will be easily to observe and will help to detect in time and avoid safety accidents.

 Constuction hoist Mast Section Bolts