0-46m FC Rack Pinion Construction Material Building Hoist Lift

0-46m FC Rack Pinion Construction Material Building Hoist Lift

0-46m speed FC motor cage with C door material hoist Overview The hoist design is truly modular, so the drive devices and cages are generic and interchangeable. Available in a multiple choice of doors or ramps. The modular and standard system offers flexibility, efficiency, low energy...
Chat Now

Product Details

0-46m FC Rack Pinion Construction Material Building Hoist Lift


Overview 

The MP-B07, MP-B08 hoist design is truly modular, so the drive devices and cages are generic and interchangeable. Available in a multiple choice of doors or ramps. 

The modular and standard system offers flexibility, efficiency, low energy consumption and low cost of ownership, making it the ultimate choice for both construction and rental companies.

Use 16Mn and Q345 high strength steel to make the structural part.

A cage top crane available to facilitate the assembly. 

One cage or two cages are available. 

Frequency control makes starting and stopping very smoothly, with low starting current and much less wear and tear.  

Manual or Automatic Controls optional. 

Fault detect, display and alarm, and automatic cage landing/stop and floor selection, the Multi-function Control System, is available. 

TUV proof.  

Features 

* Apply high efficiency and energy-saving helical gearbox. 

* Racks bolted at the center of mast sections, with less partial load torque of cages, make the machine run more stably and smoothly.  

* Apply non-eccentric rollers, so, need to adjust the rollers after installs. That means easier installation and less errors. * Cage roof made by a full tread plate with edges totally welded. No water leakage at cage roof.

* With very big and strong car frame. 

* Available in flap door. 

* Additional 'C' door at cage side.

* LED Interior Car Lighting. 

* Interlocked roof door. 

* Drop test facility with remote. 

* A frequency control (FC), with closed-loop. 

* Composite Power & Control Cable, or Sliding contact line (Integrated Conductive Rail or Busbar).  

* Easy access to electrical panels for maintenance.  

* Certified safety braking system. 

Technical Data   

Payload   capacity 2,000 kg
Lifting speed          0–46 m/min.
Max. lifting height 450 m 
Cage width (internal)              1.5 m
Cage length (internal)               3.2 m
Cage height (internal)           2.35 m
Cage doorsentrance door + exit door + side door
Motor control                      FC control
Engine power2x15 kw
GearboxHelical reducer 
Safety device type                 centrifugal brake
Power supply range               380–500 V, 50 or 60 Hz, 3 phase
Type of mast                         square column 650*650 mm with bolted rack
Length mast section              1.508 m
Rack module          8
*  Be equipped with a frequency control unit (FC), with closed-loop. 


MPB 19.jpg

MPB 7.jpg

What special safe facilities should be tested before using of newly instal construction elevators?

When general devices pass test and inspection and conform to requirements, some special tests and inspections must be done to ensure safe use of hoist, the inspections shall cover following contents at least:

a. Test and inspection of Anti-falling Safety Device shall satisfy:

Ensure that anti-falling safety device has been correctly installed; the safety device shall be in the regulated valid period (valid period of falling protector is not more than 1 year since last test. After 5 years using, the safety device shall be scrapped, calculating from the date of production that show on nameplate, and be replaced by a new one.); drop test with rated load shall be done according to description in G ‘Cage Anti-falling Test’ of <Installation Manual>. The sliding distance of cage in falling test shall meet the regulated requirement. After drop test, the safety device must be reset.

Attention: It is strictly prohibited to damage the seal of Anti-falling Safety Device!

b. Signs and operating manual

Ensure that relevant warnings and signs are complete, and operators shall have copy of this manual for reference at any time; examine the hoist operators (workers operating hoists) whether they have read, completely understood and remembered the contents and the meaning of warnings and signs in this manual.

c. Final service test

After installation and commissioning, final test run and inspection shall be done and conform to requirements.

d. Final report

After acceptance test and inspection, final report shall be submitted. This report shall summarize all the faults found in test and inspection process tersely and concisely, and illustrate all the indispensable work before using the hoist.


Inquiry