Anchor Climbing Movable All Steel Scaffolding Lift

Anchor Climbing Movable All Steel Scaffolding Lift

Anchor Climbing Movable All Steel Scaffolding Lift Overview The Anchor climbing scaffolding lift, is a complete set of scaffold engineering construction equipment for high buildings. It is used at the high-rise building of cast-in-situ frame structure and shear wall structure. It is composed of...

Product Details

Anchor Climbing Movable Scaffolding Lifts 

Overview 

It is a complete set of scaffold engineering construction equipment for high buildings, installed at the cast-in-situ frame structure and shear wall structure of high-rise buildings

It is composed of scaffold body, wall attachment climbing mechanism, driving systems, anti-falling protection systems, overload alarm system and control system, etc. 

Features of Anchor Climbing Movable Scaffolding Lifts 

* More Layers of Anti-falling Anchor are attached to the wall to improve safety and be more stable; 

* With electric hoists inside the scaffold frame, no need to be disassembled and reinstalled time and again;  

Advantage of  Scaffolding Lifts 

* Builders can do many works at the same time, including pouring concrete formwork of upper layer, the form removal of lower layer, materials turnover transportation, the side wall masonry, the prestressed tension, etc. 

* Save more than 40% costs compare with traditional scaffolding.  

* Safe, convenient and efficient.

Specification of Anchor Climbing Movable Scaffolding Lifts 

Size 
Rack-body Width 0.8 meter
Rack-body Height 15 meter
Distance between Rack-body and   Wall 0.4 meter
Electric Hoist Data
Lifting Weight7.5 Ton  
Power 500W 
Speed 12cm/minute
Truss modular type 0.6m, 0.9m, 1.2m, 1.5m & 1.8m
Anti-falling Anchor Spacing 
Horizontal adjacent4.2 meters; 
Vertically adjacent4.5 meters; 
Diagonal6.15 meters
Payload Simultaneous operation layer cannot be more than 2   layers. 

Load of each layer cannot be more than 3KN/m².
 The acreage that maximum span of bottom   supporting truss multiplying full-height of rack-body should be < 100m².

climb Scaffolding.jpg  Scaffold Lift.jpg

Inquiry